| Description | Explanation | |
|---|---|---|
| Product | Ringlock scaffolding | |
| Type | Scaffolding pole | Horizontal Rod |
| Size | 1000-2500mm | 300-1200mm |
| Wall thickness | 2.75mm | 3.25mm |
| Standard | EN 12810 / 12811 | |
| Surface treatment | Hot-dip galvanizing/Electro-galvanizing/Spray painting | |
| Application | Construction engineering, Bridges and transportation, industry and energy, etc | |
| Packaging | Steel Pallet, Plastic-Wrapped Bundles, Or package as per the customer's requirements | |
| Delivery time | 30 to 45 days from the date of drawing confirmation. | |
| Payment Terms | T/T or L/C at sight | |
Ringlock scaffolding is compatible with major systems such as Layher. We offer full customization on:
| Tube diameter(mm) | Tube thickness(mm) | Material | Weight(kg) | Length(mm) | Surface treatment |
|---|---|---|---|---|---|
| 48 | 3.25 | Q345 | 12.75 | 2500 | Hot-dip galvanizing 120μm |
| 48 | 3.25 | Q345 | 10.45 | 2000 | Hot-dip galvanizing 120μm |
| 48 | 3.25 | Q345 | 8.02 | 1500 | Hot-dip galvanizing 120μm |
| 48 | 3.25 | Q345 | 5.17 | 1000 | Hot-dip galvanizing 120μm |
| Tube diameter(mm) | Tube thickness(mm) | Material | Weight(kg) | Length(mm) | Surface treatment |
|---|---|---|---|---|---|
| 48 | 2.75 | Q345 | 1.41 | 300 | Hot-dip galvanizing 120μm |
| 48 | 2.75 | Q345 | 2.39 | 600 | Hot-dip galvanizing 120μm |
| 48 | 2.75 | Q345 | 3.34 | 900 | Hot-dip galvanizing 120μm |
| 48 | 2.75 | Q345 | 4.29 | 1200 | Hot-dip galvanizing 120μm |
| 48 | 2.75 | Q345 | 5.24 | 1500 | Hot-dip galvanizing 120μm |
| 48 | 2.75 | Q345 | 6.14 | 1800 | Hot-dip galvanizing 120μm |
In this 60-story commercial tower construction project in Shenzhen, we provided a full ringlock scaffolding system designed specifically for high-rise scaffolding solutions. The project required a reliable and long-lasting system due to a construction period exceeding 18 months and high structural complexity.
To meet the safety and durability demands, we used:
This heavy-duty scaffolding system covered over 5,000㎡ of the building’s facade, supporting both vertical and wind loads efficiently. The modular scaffolding structure allowed for quick assembly and dismantling, saving valuable project time.