Our ring lock scaffolding is an ideal choice for the performance and event industry. The system structure is lightweight and does not require any tools for connection. It only takes 15 seconds to set up a single node, significantly improving the efficiency of assembly and disassembly, saving labor and time costs. It is particularly suitable for short-term projects with frequent and rapid changes in scenarios.
Quick-lock design allows setup or teardown in minutes, saving labor costs for fast-paced event schedules.
Components are lightweight yet strong, making transport and manual handling easier for frequent event use.
Modular connections integrate seamlessly with standard trusses, lighting grids, and platforms.
Hot-Dip Galvanized surface resists rust and corrosion, ideal for outdoor concerts and festivals.
Durable for repeated use, maximizing ROI for rental and event companies.
| Description | Explanation | |
|---|---|---|
| Product | Ringlock scaffolding | |
| Type | Scaffolding pole | Horizontal Rod |
| Size | 1000-2500mm | 300-1200mm |
| Wall thickness | 2.75mm | 3.25mm |
| Standard | EN 12810 / 12811 | |
| Surface treatment | Hot-dip galvanizing / Electro-galvanizing / Spray painting | |
| Application | Construction engineering, Bridges and transportation, industry and energy, etc | |
| Packaging | Steel Pallet, Plastic-Wrapped Bundles, Or package as per the customer's requirements | |
| Delivery time | 30 to 45 days from the date of drawing confirmation | |
| Payment Terms | T/T or L/C at sight | |
| Standard Specifications for Vertical Bars | |||||
|---|---|---|---|---|---|
| Tube diameter (mm) | Tube thickness (mm) | Material | Weight (kg) | Length (mm) | Surface treatment |
| 48 | 3.25 | Q235 | 12.75 | 2500 | Hot-dip galvanizing 80μm |
| 48 | 3.25 | Q235 | 10.45 | 2000 | Hot-dip galvanizing 80μm |
| 48 | 3.25 | Q235 | 8.02 | 1500 | Hot-dip galvanizing 80μm |
| 48 | 3.25 | Q235 | 5.17 | 1000 | Hot-dip galvanizing 80μm |
| Standard Specifications for Horizontal Bars | |||||
|---|---|---|---|---|---|
| Tube diameter (mm) | Tube thickness (mm) | Material | Weight (kg) | Length (mm) | Surface treatment |
| 48 | 2.75 | Q235 | 1.41 | 300 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 2.39 | 600 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 3.34 | 900 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 4.29 | 1200 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 5.24 | 1500 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 6.14 | 1800 | Hot-dip galvanizing 80μm |
| Specifications and Standards for Diagonal Bracing | |||||
|---|---|---|---|---|---|
| Tube diameter (mm) | Tube thickness (mm) | Material | Weight (kg) | Length (mm) | Surface treatment |
| 48 | 2.75 | Q235 | 5.37 | 600*1500-1600 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 5.67 | 900*1500-1700 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 6.04 | 1200*1500-1860 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 6.44 | 1500*1500-2040 | Hot-dip galvanizing 80μm |
| 48 | 2.75 | Q235 | 7.04 | 1800*1500-2240 | Hot-dip galvanizing 80μm |
Our interlocking scaffolding has been widely used in concerts, sports events, festivals, rallies and public events around the world. With its advantages of stability, reliability and fast construction, it is deeply trusted by various stage design, construction and event companies, helping to create safe and stunning stage effects.
Scaffolding Usage: We utilize Q345 hot-dip galvanized ring lock scaffolding to build the main stage platform, left/right extension platforms, and the rear lighting tower structure. It covers approximately 800 square meters with a maximum height of 9 meters. Setup was fully completed in less than 48 hours.
Reason for Selection: Excellent corrosion resistance in high-temperature and humid environments. The modular design enables fast layout adjustments on-site. All components are lightweight, allowing easy manual handling without heavy machinery, saving 30% on setup time.
Result: The stage structure remained perfectly stable even during high temperatures and sudden thunderstorms. The customer highly praised the system for maximizing work efficiency.
Scaffolding Usage: Ring lock scaffolding was used to build a 1,200 square meter stand. Features a layered height design for optimal, blind-spot-free vision, supporting stage lighting and background wall structures simultaneously. The project cycle was completed in 5 days.
Reason for Selection: Adaptable modular configuration matching various height requirements. Excellent rust prevention under desert high-heat climates. Fast assembly and teardown perfect for tight scheduling. Highly reusable, reducing long-term rental costs.
Result: Construction finished ahead of schedule. The stand structure was extremely stable, meeting high-intensity load requirements safely. Customer satisfaction was exceptionally high.