Engineered for high stability, fast setup, and strict compliance with global safety frameworks. Explore our primary suspended platform series.
The high-altitude construction, restoration, and industrial maintenance sectors in the United Kingdom operate within some of the world's most rigorous safety and compliance frameworks. With directives governed heavily by the Lifting Operations and Lifting Equipment Regulations (LOLER 1998) and the Provision and Use of Work Equipment Regulations (PUWER 1998), British contractors and asset owners demand suspended access systems that deliver structural integrity under all operating circumstances.
Furthermore, standard BS EN 1808 defines strict criteria for the design, calculation, stability, and construction of suspended access equipment (SAE). Any platform deployed in cities like London, Manchester, or Birmingham must incorporate dual-wire fall-arrest systems, electromagnetic motor braking, and precise load-monitoring switches. This ensures resilience against typical British coastal wind variations and unpredictable urban wind-tunnel effects.
Additionally, the recent regulatory shift following the Building Safety Act 2022 has accelerated cladding remediation and building envelope upgrades across high-rise residential blocks. Consequently, the demand for modular, hot-dip galvanized steel or lightweight aluminum suspended cradles has grown exponentially, requiring direct channels to trusted manufacturers that can balance compliance with high-volume production.
Integrating Scientific Research, Advanced Manufacturing, and Global Logistics Support.
Founded in 2014, Hebei Shuangyang Metal Structure is a pivotal subsidiary of Zhuozhan Group that has rapidly advanced to the forefront of the industry. The company occupies a total area of 13,132.68 square meters, with a construction area of 7,124.58 square meters. Shuangyang operates with more than 500 skilled employees and is equipped with over 150 sets of advanced machinery and equipment.
Over the years, Shuangyang has successfully secured 15 patents, demonstrating its strong commitment to innovation. The company's impressive production capabilities include an annual output of 300,000 tons of steel pipes, 1 million tons of scaffolding, and 400,000 tons of adjustable steel supports, making it a critical supplier to both domestic and international markets.
Take a virtual tour through our modern workshops, showing standard raw material treatment, automated testing, and warehousing.
Our ring lock scaffolding and suspended platform components are stored and managed inside a 50,000㎡ self-owned warehouse facility, assuring instant readiness for major global procurement requests.
How we manufacture vertical and horizontal components. Strict step-by-step quality gates minimize micro-cracks and structural failure points.
Each vertical structural rod undergoes high-precision automatic welding to secure the locking disc, preventing joint fatigue.
The raw steel pipe is measured and cut using CNC circular saws. Noise and solid waste are managed at source.
Hydraulic presses punch locking points and pin apertures. Strict checks ensure accuracy within +/- 1mm.
Robotic welding arms fuse the rosette disc black parts. Gas shielding prevents weld porosity.
Hot-dip zinc bathing creates a protective layer. Minimizes corrosion from coastal air and high humidity.
Visual and manual tests verify straightness, fitment tolerances, and coating thickness before sale.
Built to resist high compressive stresses. Features casting ends securely riveted to galvanized profiles.
Steel tubes are cut to custom sizes. Leftover scrap is collected for recycling.
End connections are punched to ensure simple assembly and precise pin alignment.
Casting connectors are automatically welded. Consistent weld beads prevent high-stress failure.
The assembled rod is dipped in molten zinc. Provides complete rust protection inside and out.
Heavy-duty pins are riveted, and load checks verify stability before dispatch.
Designed and manufactured to survive extreme outdoor environments while keeping site workers safe.
Zhuozhan Industry's products are fully tested and certified under international quality systems, including EN 12810/12811 and ISO 9001.
High-strength steel combined with hot-dip galvanizing protects against rust and weathering, giving products a working life of 15 to 20 years.
Standard design allows for quick installation and simple disassembly, reducing project downtime and saving labor costs.
Combining high load capacity and flexible design to support complex facade installations.
Our structural parts are built from Q355B high-tensile steel. This delivers a single-point load capacity of up to 10 tons, which is 1.5 times that of standard steel. Designed for fast assembly, an experienced crew can set up 150 to 300 square meters of access structures per day.
With an average service life of over 10 years, these systems reduce material consumption by up to 50% compared to traditional configurations under the same load, cutting shipping costs and assembly times.
Made of Q355B material, the single bearing capacity is up to 10 tons, which is 1.5 times that of the ordinary one.
Each person can install 150 - 300 square meters per day, which is 3 - 5 times that of the traditional one.
Under the same load-bearing capacity, the consumption is reduced to 1/2 of the traditional one, and the weight is reduced to 1/2 - 1/3.
Application of Steel Props in Nanjing South Railway Station Expansion
Frame Scaffold for Residential Renovation – Bologna, Italy
Cuplock Scaffold Solution for Power Plant Expansion Project
Ringlock Scaffold in Smart Manufacturing Plant – Changzhou, China
Ringlock Scaffold in Port Pipeline Construction
Ringlock Scaffold in Hydropower Dam Upgrade
Ringlock Scaffold Solution for Highway Tunnel Construction
Scaffolding System for Science & Technology Park Factory Building
Explore our full range of structural equipment, including suspended platforms, heavy-duty scaffolding, couplers, and formwork solutions.
Why UK procurement managers work directly with Hebei Shuangyang Metal Structure under the Zhuozhan Group brand.
Our factories are located close to three major shipping terminals: Jingtang Port, Tianjin Port, and Caofeidian Port. This connection helps reduce land transport times and container shipping costs.
A 40,000 square meter facility generates an annual output of over 200,000 tons. This capacity allows us to manage large orders without production delays.
We work with state-owned enterprises like China Construction Fourth and Eighth Engineering Divisions, demonstrating our ability to meet strict quality and scheduling requirements.
Expert engineering insights on safety limits, structural compliance, and shipping logistics to the UK.
Our ZLP series features a dual-wire safety setup: one primary lifting rope and an independent safety rope. If the hoist cable slips or breaks, our mechanical safety lock stops the platform within 100mm. Each hoist uses an electromagnetic braking system that engages automatically if power is lost, meeting BS EN 1808 guidelines.
Shipping from Tianjin Port to major UK ports (such as Felixstowe, Southampton, or London Gateway) takes around 30 to 40 days. Custom orders require additional production time depending on specifications, which is agreed upon during order confirmation.
Yes. The high humidity and coastal wind patterns in the UK accelerate corrosion on standard painted steel. Our hot-dip galvanized parts are coated inside and out to resist rusting, ensuring a reliable working life in damp conditions.
Yes, our design team can engineer parapet clamps, customizable counterweight systems, and specialized davits to suit historic architecture where standard parapets or flat roofs are not suitable, ensuring safe access without compromising the facade.
Get in touch with our engineering team for technical drawings, pricing quotes, and compliance documentation for the UK and global markets.
Send Inquiry Now